Before You Hire Anyone, Make Sure You Know What's Included.
Just As Important, Know What Is Not Included.
What We Do:
We Draw The Following Blueprint Elements:ELEVATION VIEWS: Front, Rear and SidesFLOOR PLAN VIEWS: Foundation, First, Second Floors.SECTION VIEWS, AS REQUIRED.CABINET ELEVATION VIEWS: Kitchen and BathroomsSUGGESTED ELECTRICAL LAYOUT VIEWS: Foundation, First And Second Floors. Smoke and Carbon Monoxide Detectors Heat Detectors Exhaust FansWE PROVIDE:ANDERSEN© WINDOW SCHEDULES, BY FLOOR: Window Unit Size (Call Size) Window Rough Openings Window Header Heights Safety Glass Requirements Fall Protection Requirements Clear Opening Clear Opening Height and Width Window U FactorsVELUX© SKYLIGHT SCHEDULES: Skylight Unit Size (Call Size) Skylight Rough Opening Skylight U FactorINTERIOR AND EXTERIOR DOOR SCHEDULES: Door Unit Size (Call Size) Door Unitt Rough Openings Unit U Factor For Exterior DoorsELECTRICAL SCHEDULE: Foundation, First, Second Floors Electrical Elements Schedule Per RoomDECKS: Deck Size Railing and Stairs Posts, Beams Footing Sizes Largest Tributary Size For Footings Anti Lateral Brace Location And Type
What We Do Not Do:
Manual J, D, or S Calculations And/Or DesignsRes-CheckSite PlansPlot PlansSurveyVariancesBulk TablesUtility Hook UpsSeptic PlanAnything Outside Of The Building Footprint